Lee Dance Studio
Dance Floor  Installation

CURRENT PROJECTS

Planning

Design

Repair Roof

Construction

Window & Door Replacement for Critical Maintenance

Intramural Softball Infield Repair

Completed Projects
Description Benef. Occup.
Program Study for Intramural & Recreation 04.2017
Remove Fuel Tank 02.2017
Install Dance Floor - Room 300 11.2016
Mechanical Upgrades 01.2009
Swetman/Poucher Surge Space 01.2006
Small Boiler for Lakefront Buildings 10.2003
Asbestos Abatement/Replace Condensation Tanks & Piping 08.1998
Replace Water Treatment Equipment 02.1997
Repair Breeching  08.1996
Rehab Steam Traps 04.1995
Replace Burners/Combustion Controls 04.1995
Emergency Repairs to Boiler Stack/Breeching 10.1994
Replace Roof 09.1994
Replace Fans 03.1992
Replace Ballasts in Fluorescent Fixtures 05.1991
Alterations for Safety 06.1989
Develop ECM  01.1988
Replace Caulking 07.1987
Install New Temperature Controls for Fan 07.1986
Replace Boiler 04.1986
Replace Boiler Insulation 03.1986
Repair/Replace HVAC Heating Coils 02.1986
Replace Smoke Indicators & Boilers 03.1985
Replace Air Compressor/Install Batteries 11.1984
Repair Insulation/Covering on Breeching  11.1984
Install New Fireproof Suspended Ceilings 06.1980
Replace Combustion Controls 04.1980
Air Pollution Control 03.1978
Install New Boiler Casings 07.1975
Replace Boiler Tubes 11.1972
Rehab Boiler Room 10.1970
Addition to Heating Plant 11.1965
Construct Heating Plant/Athletic Hall 09.1958