CURRENT PROJECTS

Planning

Design

Construction

Completed Projects
Description Benef. Occup.
Dining Hall Renovations 04.2017
Rebuild Louvres 07.1998
Alterations for Safety 08.1997
Repair Emergency Lighting System 12.1992
Install Electric & Steam Meters 04.1992
Replace Roofs 06.1991
Develop ECM 01.1988
Alter/Improve Ventilation 10.1987
Replace Temperature Controllers 06.1986
Energy Conservation Study 10.1985
Install Fire Suppression System 03.1985
Install Electric Meters 03.1984
Repair Roof 08.1983
Install Heating Equipment Insulation 07.1977
Replace Fire Hoses 06.1976
Correct Leaks in Connecting Tunnels 09.1975
Construct Dining Hall 09.1968