Description | Benef. Occup. |
Program Study for Intramural & Recreation | 04.2017 |
Remove Fuel Tank | 02.2017 |
Install Dance Floor - Room 300 | 11.2016 |
Mechanical Upgrades | 01.2009 |
Swetman/Poucher Surge Space | 01.2006 |
Small Boiler for Lakefront Buildings | 10.2003 |
Asbestos Abatement/Replace Condensation Tanks & Piping | 08.1998 |
Replace Water Treatment Equipment | 02.1997 |
Repair Breeching | 08.1996 |
Rehab Steam Traps | 04.1995 |
Replace Burners/Combustion Controls | 04.1995 |
Emergency Repairs to Boiler Stack/Breeching | 10.1994 |
Replace Roof | 09.1994 |
Replace Fans | 03.1992 |
Replace Ballasts in Fluorescent Fixtures | 05.1991 |
Alterations for Safety | 06.1989 |
Develop ECM | 01.1988 |
Replace Caulking | 07.1987 |
Install New Temperature Controls for Fan | 07.1986 |
Replace Boiler | 04.1986 |
Replace Boiler Insulation | 03.1986 |
Repair/Replace HVAC Heating Coils | 02.1986 |
Replace Smoke Indicators & Boilers | 03.1985 |
Replace Air Compressor/Install Batteries | 11.1984 |
Repair Insulation/Covering on Breeching | 11.1984 |
Install New Fireproof Suspended Ceilings | 06.1980 |
Replace Combustion Controls | 04.1980 |
Air Pollution Control | 03.1978 |
Install New Boiler Casings | 07.1975 |
Replace Boiler Tubes | 11.1972 |
Rehab Boiler Room | 10.1970 |
Addition to Heating Plant | 11.1965 |
Construct Heating Plant/Athletic Hall | 09.1958 |