Description Benef. Occup.
Replace PCB Transformers 10.1999
Replace Entrance Doors 06.1992
Replace Bathroom Partitions 01.1992
Replace Roof 07.1991
Asbestos Abatement 01.1991
Provide Smoke Detectors 01.1990
Furnish/Install Hot Water Boilers 12.1989
Change Order for Exterior Rehab 04.1987
Safety Rehab 04.1987
Install Safety Bars & Window Latches 09.1986

Repair Tunnel Leaks from Cayuga to Pathfinder

09.1985
Install Electric Meters  03.1984
Replace Domestic Water Heating Unit 06.1983
Install Door Magnets 01.1983
Replace Steam Converters & Water Heaters 10.1982
Replace Entrance Doors 06.1980
Install Fire Protection Storage Rooms 06.1979
Repair Roof  06.1978
Install Insulation in Heating Equipment 07.1977
Dorm 408 Beds 07.1967
Construct Residence Hall 05.1967